Question 1

It is recommended that when beginning a 5S program it be started in a pilot work area for learning and demonstration purposes then it is expended throughout the plant.

Options :
Answer: A

Question 2

To reduce the people or operator introduced defects into a process it is best if a Belt can design and implement a means of ________________ into the process.

Options :
Answer: C

Question 3

Six Sigma refers to a process whose output has at least 95% of its data points within 6 Standard Deviations from the Mean.

Options :
Answer: B

Question 4

A 5 Why Analysis is used to help identify possible defect causes when which one of the below listed tools is created?

Options :
Answer: A

Question 5

The length of wooden beams being sawed is measured by a line operator. Which is least likely to be influenced by the instrument?

Options :
Answer: C

Viewing Page : 1 - 16