Smartly Prepare Exam with Free Online CTAL-TM_Syll2012DACH Practice Test

We offer the latest CTAL-TM_Syll2012DACH practice test designed for free and effective online ISTQB Certified Tester Advanced Level - Test AnalystISTQB Certified Tester Advanced Level - Test Manager (Syllabus 2012, D, A, CH only) certification preparation. It's a simulation of the real CTAL-TM_Syll2012DACH exam experience, built to help you understand the structure, complexity, and topics you'll face on exam day.

Exam Code: CTAL-TM_Syll2012DACH
Exam Questions: 65
ISTQB Certified Tester Advanced Level - Test AnalystISTQB Certified Tester Advanced Level - Test Manager (Syllabus 2012, D, A, CH only)
Updated: 25 Aug, 2025
Viewing Page : 1 - 7
Practicing : 1 - 5 of 65 Questions
Question 1

Topic 2, Test Management


Test Management
Which of the following statements about management of product quality risks in mature
organizations with respect to the lifecycle, is true?
Number of correct responses: 1
K2 1 credit 

Options :
Answer: B

Question 2

Topic 4, Defect Management


Defect Management
Consider a defect report and assume that a part of its lifecycle includes the following
states:
New: Is the initial state
Working: Means that the developers are addressing the defect in order to produce a fix for
the defect
Clarification: Means that the developers need more information from the tester to address
the defect and produce a fix for the defect and the tester is working to provide this
information to the developers
Verification: Means that a fix for the defect has been produced and the tester is running the
adequate tests to verify whether the fix solves the defect
Closed: is the final state
Which of the following answers represents an invalid sequence of states that can’t lead the
bug report to the “Closed” state?
Number of correct responses: 1
K2 1 credit
 

Options :
Answer: C

Question 3

Test Management
In the next two months some new features will be constantly added to new releases of a
project you are working on as Test Manager.
You have identified as one of the main project risks, that the requirements specification will
still be incomplete when your team starts the test design and implementation phase.
Some requirements will most likely be completed too late to allow a proper test preparation.
You and your test team have already worked on several similar past projects in the same
organization.
Which one of the following options would you expect to be the most effective at mitigating
this risk?
Number of correct responses: 1
K4 3 credits

Options :
Answer: B

Question 4

Test Tools and Automation
In your organization the following tools of the same vendor are currently in use: a
requirements management tool, a test management tool and a bug tracking tool.
You are the Test Manager.
You are currently evaluating a test automation tool of the same vendor (to complete the
vendor's tool suite) against an interesting open-source test automation tool under the GNU
GPL (General Public License).
There are no initial costs associated to that open-source tool.
Which of the following statements associated to the selection of the open-source tool is
correct in this scenario?
Number of correct responses: 1
K2 1 credit

Options :
Answer: B

Question 5

Test Management
You are managing the system testing for a SOA based system. The integrated system
consists of several subsystems:
- a SOA middleware
- a CRM (Customer Relationship Management) system
- a BRM (Billing and Revenue Management) system
- a SMS (Subscriber Management System) system
and you performed a risk analysis based on these subsystems.
At the end of the scheduled period for test execution you produce a first classical report
based on the traditional metrics of testing. Test pass/fail status and bug status
(open/resolved) That table provides you a distorted picture of the quality risk, because
there is no indication of the risk level of the failed tests, the tests not run, or the open bugs.
Thus, you produce the following table to solve this distortion issue:

CTAL-TM-Syll2012-page54-image29

In the table above, where you have introduced the concept of risk weighting, the highest
risk test or bug report has a score of 1, while the lowest risk test or bug report has a score
of 0.04.
Which of the following subsystems, based on the risk scores of the table, is most risky?
Number of correct responses: 1
K4 3 credits 

Options :
Answer: B

Viewing Page : 1 - 7
Practicing : 1 - 5 of 65 Questions

© Copyrights FreePDFQuestions 2025. All Rights Reserved