Exam Code: CTAL-TTA
Exam Questions: 238
ISTQB - Certified Tester Advanced Level - Technical Test Analyst
Updated: 22 Sep, 2026
Viewing Page : 1 - 24
Practicing : 1 - 5 of 238 Questions
Question 1

Based on the state diagram above, how many test cases are needed to achieve 1-switch coverage?  

Options :
Answer: C

Question 2

Which TWO of the following statements about Maintainability testing are TRUE?

A) It should start as soon as the draft design documents are available for review

B) An application can be considered maintainable when static analysis and code review defects have been

fixed

C) It tests the regression impact of software or environmental changes to an operational system

D) It can be performed during Operational Acceptance Testing by multiple departments

E) It can be performed during User Acceptance Testing to ensure business processes can be maintained

Options :
Answer: B

Question 3

You have been assigned the task of conducting the performance efficiency testing for a new Internet toolbar. Which of the following would be a valid test condition for this quality characteristic?

Options :
Answer: B

Question 4

You have conducted static analysis on several new modules for an existing product. You are now executing test cases and are seeing inconsistent problems including crashes. Intermittent error messages are appearing. Despite all your best efforts, you are not able to find reproducible scenarios to force these errors. What problem in the code are you likely seeing?

Options :
Answer: A

Question 5

You are responsible for the non-functional testing of a website supporting a popular restaurant chain. Due to the rapid expansion of the number of restaurants in the chain, the company is expecting the peak number of concurrent website views to more than triple in the next 6 months. As a result, it has purchased two further production servers to support the existing one. A new hardware release has been scheduled for which the following product risk has been recorded: {Insert Table 2) Which one of the following non-functional test typos would be BEST to mitigate this risk?


Options :
Answer: C

Viewing Page : 1 - 24
Practicing : 1 - 5 of 238 Questions

© Copyrights FreePDFQuestions 2026. All Rights Reserved

We use cookies to ensure that we give you the best experience on our website (FreePDFQuestions). If you continue without changing your settings, we'll assume that you are happy to receive all cookies on the FreePDFQuestions.