Exam Code: CTAL-TTA
Exam Questions: 238
ISTQB - Certified Tester Advanced Level - Technical Test Analyst
Updated: 25 Aug, 2026
Viewing Page : 1 - 24
Practicing : 1 - 5 of 238 Questions
Question 1

Which statement is correct regarding the use of exploratory testing for safety critical systems? SELECT ONE OPTION

Options :
Answer: C

Question 2

Which statement about test automation is TRUE7 SELECT ONE OPTION

Options :
Answer: B

Question 3

Which of the following statements BEST describes how tools support model-based testing? 

Options :
Answer: A

Question 4

You are responsible for planning the non-functional testing for a new product. You will be responsible for the performance testing and you have determined that you will need a simulator to complete your work, Which of the following are considerations when purchasing a simulator? 1.Path testing of the tool 2.Time to test the tool 3.cost of hmng specialists 4.Susceptibility to the "probe effect" 5.Method and bme to upgrade and retest the tool as the software changes 6.Control flow analysis

Options :
Answer: B

Question 5

A project to replace your company's sales and merchandising system has begun. The old system is still in production but is poorly documented and expensive to maintain: changing it has often produced a large quantity of defects. The new version will be developed using modern techniques and technology. Requirements include: Loading sales data, sent electronically from the stores each evening, into a central database where it is then available for other applications. Producing sales reports for the merchandisers, whose job is to manage stock levels in stores. Predictions of future demand for each product, based on a combination of sales history and forecasting parameters. Requirements 1 and 2 are satisfied by the existing system and will be rewritten with no significant changes. Requirement 3 is new: these forecasting reports will be run overnight, and users will request them by entering simple parameters online during the day. The sales data are loaded in an overnight batch run. There have been problems at peak periods when this run has taken longer than scheduled, so that dependent jobs could not finish before the start of the working day. As a Technical Test Analyst, you have been asked to contribute to the project's Master Test Plan. The key stakeholders are: The Merchandising Manager, who wants parameter entry to be quick and easy. The Data Centre Manager, who requires the new batch jobs to take less time than the old ones. No specific performance requirements have been given, either for the batch jobs or for online parameter entry. Which TWO of the following will BEST meet the objectives of the stakeholders? 

Options :
Answer: A,B

Viewing Page : 1 - 24
Practicing : 1 - 5 of 238 Questions

© Copyrights FreePDFQuestions 2026. All Rights Reserved

We use cookies to ensure that we give you the best experience on our website (FreePDFQuestions). If you continue without changing your settings, we'll assume that you are happy to receive all cookies on the FreePDFQuestions.