Exam Code: CTAL-TTA_2019DACH
Exam Questions: 238
ISTQB Certified Tester Advanced Level - Technical Test Analyst
Updated: 23 May, 2026
Viewing Page : 1 - 24
Practicing : 1 - 5 of 238 Questions
Question 1

You are testing software that requires you to enter defined order numbers and either add, delete or update the information associated with that order number, which of the following is the minimum set of columns you should see in your keyword-driven input table?

Options :
Answer: C

Question 2

You are working on a project that is integrating code from multiple development groups. There have been numerous integration problems, particularly regarding reliability, error recovery and transactional integrity. You are now responsible for planning the performance efficiency testing for this product. There Is a strong feeling among the development managers that some parts of the code are weaker than others and will tend to exhibit problems during the performance efficiency testing. To identify these problematic areas as soon as possible, which type of testing should you do?

Options :
Answer: C

Question 3

How many test cases are needed to test code fragment lines 26 – 32 to achieve 100% condition
determination coverage?

Options :
Answer: B

Question 4

The Bonus Program is perceived by management to be critical. Defects in the program would almost
immediately lead to financial loss. In the past an improvement program has been run to implement review
based on IEEE 1028. Knowledge and skills on both formal and informal reviews are available. There is also
an existing pool of review leaders. Which of the following review types would you choose to review the
program?

Options :
Answer: B

Question 5

A project to replace your company's sales and merchandising system has begun. The old system is still in production but is poorly documented and expensive to maintain: changing it has often produced a large quantity of defects. The new version will be developed using modern techniques and technology. Requirements include: Loading sales data, sent electronically from the stores each evening, into a central database where it is then available for other applications. Producing sales reports for the merchandisers, whose job is to manage stock levels in stores. Predictions of future demand for each product, based on a combination of sales history and forecasting parameters. Requirements 1 and 2 are satisfied by the existing system and will be rewritten with no significant changes. Requirement 3 is new: these forecasting reports will be run overnight, and users will request them by entering simple parameters online during the day. The sales data are loaded in an overnight batch run. There have been problems at peak periods when this run has taken longer than scheduled, so that dependent jobs could not finish before the start of the working day. As a Technical Test Analyst, you have been asked to contribute to the project's Master Test Plan. The key stakeholders are: The Merchandising Manager, who wants parameter entry to be quick and easy. The Data Centre Manager, who requires the new batch jobs to take less time than the old ones. No specific performance requirements have been given, either for the batch jobs or for online parameter entry. Which TWO of the following will BEST meet the objectives of the stakeholders? 

Options :
Answer: A,B

Viewing Page : 1 - 24
Practicing : 1 - 5 of 238 Questions

© Copyrights FreePDFQuestions 2026. All Rights Reserved

We use cookies to ensure that we give you the best experience on our website (FreePDFQuestions). If you continue without changing your settings, we'll assume that you are happy to receive all cookies on the FreePDFQuestions.