Question 1

An administrator is asked to install and power-on a new MX740c sled in an MX7000 chassis. The
administrator inserts the sled and presses the power button. They notice that the power button LED is
blinking green. After a short time power button turns to solid green and the server finally turns on.
What operation was in progress when the power button was blinking green?

Options :
Answer: A

Question 2

Which command(s) is supported in the current PowerEdge MX Redfish implementation? 

Options :
Answer: D

Question 3

An MX7000 administrator has been tasked to perform the initial configuration of a new MX platform. The
MX700 has seven MX740c, one MX5016s, two Management Modules (MMs), an LED-Only control panel,
two MX9116n in Fabric A, two MX5108n in Fabric B, and two MX5000s in Fabric C.
What is a valid method to perform the initial MX platform configuration?

Options :
Answer: D

Question 4

What is a characteristic of MX7000 networking in Scalable Fabric Mode? 

Options :
Answer: D

Viewing Page : 1 - 6
Practicing : 1 - 5 of 55 Questions

© Copyrights FreePDFQuestions 2025. All Rights Reserved

We use cookies to ensure that we give you the best experience on our website (FreePDFQuestions). If you continue without changing your settings, we'll assume that you are happy to receive all cookies on the FreePDFQuestions.