If a cooling system uses a DX scheme, it can plan the deployment sequence of the air handling units and outdoor units accordingly.
According to GB50174-2017, data centers using chilled water cooling systems should have thermal storage devices, with storage time meeting operational needs. Is this correct?
Regarding the use of circuit breakers, which of the following descriptions are correct?
Adjusting the high air temperature at the end of the cooling system can effectively reduce the energy consumption of the cooling system and lower the PUE (Power Usage Effectiveness) value.
In the future, data centers may achieve unattended monitoring using new technologies, utilizing AI for sound, image, and odor signal collection and analysis, thereby reducing the need for human observation.