Exam Code: MuleSoft-Integration-Architect-I
Exam Questions: 276
Salesforce Certified MuleSoft Platform Integration Architect (Mule-Arch-202)
Updated: 26 Nov, 2025
Viewing Page : 1 - 28
Practicing : 1 - 5 of 276 Questions
Question 1

An Order microservice and a Fulfillment microservice are being designed to communicate with their dients through message-based integration (and NOT through API invocations). The Order microservice publishes an Order message (a kind of command message) containing the details of an order to be fulfilled. The intention is that Order messages are only consumed by one Mute application, the Fulfillment microservice. The Fulfilment microservice consumes Order messages, fulfills the order described therein, and then publishes an OrderFulfilted message (a kind of event message). Each OrderFulfilted message can be consumed by any interested Mule application, and the Order microservice is one such Mute application. What is the most appropriate choice of message broker(s) and message destination(s) in this scenario? 

Options :
Answer: B

Question 2

An organization currently uses a multi-node Mule runtime deployment model within their datacenter, so each Mule runtime hosts several Mule applications. The organization is planning to transition to a deployment model based on Docker containers in a Kubernetes cluster. The organization has already created a standard Docker image containing a Mule runtime and all required dependencies (including a JVM), but excluding the Mule application itself. What is an expected outcome of this transition to container-based Mule application deployments?

Options :
Answer: A

Question 3

A new upstream API Is being designed to offer an SLA of 500 ms median and 800 ms maximum (99th percentile) response time. The corresponding API implementation needs to sequentially invoke 3 downstream APIs of very similar complexity. The first of these downstream APIs offers the following SLA for its response time: median: 100 ms, 80th percentile: 500 ms, 95th percentile: 1000 ms. If possible, how can a timeout be set in the upstream API for the invocation of the first downstream API to meet the new upstream API's desired SLA? 

Options :
Answer: D

Question 4

An external REST client periodically sends an array of records in a single POST request to a Mule application API endpoint. The Mule application must validate each record of the request against a JSON schema before sending it to a downstream system in the same order that it was received in the array Record processing will take place inside a router or scope that calls a child flow. The child flow has its own error handling defined. Any validation or communication failures should not prevent further processing of the remaining records. To best address these requirements what is the most idiomatic(used for it intended purpose) router or scope to used in the parent flow, and what type of error handler should be used in the child flow?

Options :
Answer: B

Question 5

What is not true about Mule Domain Project?

Options :
Answer: C

Viewing Page : 1 - 28
Practicing : 1 - 5 of 276 Questions

© Copyrights FreePDFQuestions 2025. All Rights Reserved

We use cookies to ensure that we give you the best experience on our website (FreePDFQuestions). If you continue without changing your settings, we'll assume that you are happy to receive all cookies on the FreePDFQuestions.